The Brannin Creek Bridge Replacement was awarded to SEI by Tehama County after competitive bidding. The project consisted of constructing a detour, removing the existing bridge, and constructing a new bridge in its place. The bridge consisted of two abutments and two concrete bent walls founded on driven pile foundations. The cast-in-place deck was a 17" thick concrete flat slab. Additional site work included constructing the roadway approaches, and paving.