O'Neil Creek Bridge Replacement

Seiad Valley, CA

Replace existing culverts on Highway 96 with a 45' clear span, pre-cast, and prestressed voided slab bridge on CIP concrete abutments. Install a temporary signal and detour on a 20' tall sheetpile retained embankment adjacent to the structure excavation.

  • Project Cost $1.6 million
  • State of California, Department of Transportation
  • SEI Project Manager/Superintendent Roger Ellicock